The rope locker bulkhead is framed up.
The other side of the bulkhead has framing along the sides. The other side is the side that will show, and it looks even better(no footballs).
You can also see the stemhead knee on the right. It’s the forward most structural member.
Now on to the building form they go. I also need to respace all my frames since I am going to build it 30ft instead of 33ft. Over 31 feet would put it in a property tax bracket I don’t want it to be in.
It looks like you are making good progress on the boat.